Icon about-block-ico-1 Icon about-block-ico-2 Icon about-block-ico-3 Icon about-block-ico-4 Icon announcement-close Icon arrow-left Icon arrow-right Icon arrow-sm Icon asterisk Icon banner-transparent-vector Icon careers-item-location Icon careers-item-time Icon careers-item-type Icon careers-mail-ico Icon careers-phone-ico Icon careers-search-ico Icon careers-single-hero-vector Icon careers-single-more-vector Icon careers-vector Icon check Icon close Icon dfm-image-left-vector Icon dfm-image-right-vector Icon document Icon download-popup-vector Icon dropdown Icon envelope Icon facebook Icon faq-banner-bg Icon faq-title-ico-active Icon faq-title-ico Icon featured-links-block-bg Icon figure-1 Icon figure-10 Icon figure-11 Icon figure-12 Icon figure-13 Icon figure-14 Icon figure-15 Icon figure-2 Icon figure-3 Icon figure-4 Icon figure-5 Icon figure-6 Icon figure-7 Icon figure-8 Icon figure-9 Icon file-upload Icon form-sidebar-back Icon form-step-done Icon gmap-marker-group-icon Icon gmap-marker-icon Icon header-profile-ico Icon instagram Icon link Icon linkedin Icon loader Icon mail Icon phone Icon play-yt Icon play Icon post-nav-arr-left Icon quote-banner-vector Icon quote-block-aside-vector Icon quote-contact-phone-ico Icon quote-contact-position-ico Icon sidebar-location Icon sidebar-phone Icon technology-banner-nav-left-vector Icon technology-banner-nav-right-vector Icon twitter Icon webinar-item-date-vector Icon whitepaper-img-ico-left Icon whitepaper-img-ico-right Icon whitepapers-listing-banner-ico Icon whitepapers-single-aside-vector Icon youtube Icon yt-play-button

How to Prevent Holds

Consignment orders are defined as when a customer sends components and/or boards in a single box or “kit.”

Unfortunately, 1 out of every 2 consignment kits go hold, which can cause delays of up to 5 days. Here’s why and what you can do about it.

1. Overages

The number one problem with consignment kits is that customers do not send enough extra parts to account for normal attrition. While Summit does not experience much loss, a small amount of overages is required to avoid delay.

2. Substitute Parts

We understand substitute parts are often provided when originally designated parts can not be provided. However, many customers fail to communicate when a change has been made. This means the parts in the kit do not match the part list on the Bill of Materials (BOM). To avoid this issue, please clearly communicate and label part substitutions.

3. Moisture-Sensitive Parts

When customers provide parts, they are often loose or in opened bags. This can cause a serious problem if a part is installed that isn’t moisture-free or needed to be pre-baked prior to assembly. Also, there is no way to determine the shelf-life of the part.

4. Inconsistent Labeling

There are many ways parts are labeled. First, customers often have their own, internally-developed part designation system. Then there’s the label given to a part by the manufacture or manufacturers. PCB assembly companies also give parts reference designators once the BOM is checked by design-for-assembly software. Without careful attention to detail it is easy to label different parts with different designators. This is why Summit’s assembly facility always provides kit labels for consignment orders.

5. Split Kits

When customers have multiple jobs being assembled at the same time, they often put the parts and boards for all jobs in a single box without indicating which parts / boards are to be used for which project. Not only can this cause delays while Receiving splits the kits, it also greatly increases the chances for lost or misplaced components.

6. Waiting for Your Response

Assembling jobs correctly the first time is our top priority. When there are questions with consignment kits, we reach out to customers for clarification. How quickly the issues are resolved is up to you. While some customers get back to us in minutes, many can take days, causing significant delays on their projects.

To avoid these problems and many others, we’ve created guidelines for preparing your parts kit. Click here to download it.

Assembly capabilities highlights

  • Low to mid-volume PCB assembly
  • SMT and through-hole mounting
  • Parts in any format
  • ISO 9001:2015 & AS9100:D
  • Fine pitch to 0.4 mm and passives down to 01005
  • Ball grid array
  • View all capabilities

Contact Us

We’re available to answer any questions.

Call Us

(877) 264-0343

Send us an email

— Fill out the form below and send the message.

MSIRobot